Free planning tools
Renovation cost calculators
Get an instant planning range for your project by size, material, and features. Built on typical Northern California installed pricing — then connect with a local contractor for an exact quote.
Deck Cost Calculator
Get a fast planning range for a new deck by size, material, and features.
Open calculator →Siding Cost Calculator
Estimate what re-siding your home could cost by wall area and material.
Open calculator →Fence Cost Calculator
Estimate a new fence by length, material, and height.
Open calculator →How the calculators work
1
Enter your project
Size, material, height, and add-ons like gates, railings, or tear-off.
2
See a live range
An all-in installed low–high range for Northern California, with a breakdown.
3
Get an exact quote
Send the details to one local contractor to confirm a real price.
These calculators provide general educational cost ranges for planning only and are not quotes. Local Renovation Pros is a contractor-matching platform, not a licensed contractor, and does not set prices.
