Tip 1
Gates cost more than fence: every gate needs posts, hardware, and bracing, so a run with several gates prices higher per foot than a plain straight run.
Free fence cost estimator
Estimate a new fence by length, material, and height. Wood is the value pick; vinyl and ornamental metal cost more but last longer with less upkeep. Add gates and old-fence removal to see a realistic planning range.
A calculator gets you a ballpark. An exact price comes from a contractor who sees the property. Share your ZIP and project details and we'll check local availability, then connect you with one independent fencing contractor — no obligation, and your details aren't blasted to a dozen companies.
Step 1 of 2
Saved
Request received
Project reference:
Installed cost per lin ft in Northern California, and what you're trading off. Ranges span $20–$90 per lin ft depending on the material and your project.
| Material | Installed / lin ft | Notes |
|---|---|---|
| Chain-link | $20–$45 | Lowest cost; security and pet containment over privacy. |
| Wood (pressure-treated) | $28–$55 | Most popular privacy fence; needs sealing to maximize life. |
| Wood (cedar / redwood) | $40–$75 | Better rot resistance and looks than pressure-treated pine. |
| Vinyl | $35–$70 | No painting, long life; higher up-front cost than wood. |
| Ornamental aluminum / steel | $45–$90 | Decorative and durable; open pickets rather than full privacy. |
Tip 1
Gates cost more than fence: every gate needs posts, hardware, and bracing, so a run with several gates prices higher per foot than a plain straight run.
Tip 2
Height and privacy change the number: a 6 ft solid privacy fence uses far more material than a 4 ft picket over the same length.
Tip 3
Property lines and permits: confirm the line (a survey helps) and check local height and setback rules — some cities require a permit above a certain height.
Homeowner planning library
Estimate a new fence by length, material, height, and gates before you request a bid.
Read the guide →Normalize scope, allowances, exclusions, schedule, payments, and warranty before comparing totals.
Read the guide →It gives an educational planning range based on typical Northern California installed pricing — not a quote. Your actual price depends on site conditions, access, design details, and material grade. Use it to set a budget, then request an estimate from a local independent fencing contractor for a firm number.
The range reflects installed cost — materials and labor together, all-in per lin ft — plus any add-ons you toggle on. It does not include permit fees, which vary by jurisdiction, or unusual site work your contractor may identify on-site.
Renovation pricing genuinely spans a wide band. Material grade, height, access, prep, and finish level each move the number. Showing the honest spread is more useful than a single figure that turns out wrong once a contractor sees the property.
Wood, vinyl, chain-link, and ornamental metal fencing, plus gates, are commonly installed. Note your material in the request.
Yes. Repairs, section replacement, and gate fixes are supported alongside new fence installation.
This calculator provides general educational cost ranges for planning only and is not a quote, appraisal, or contractor estimate. Local Renovation Pros is a contractor-matching platform, not a licensed contractor, and does not set prices. Actual pricing is provided by independent contractors after reviewing your property.